Wokingham Town Centre Refurbishment project

CASE STUDY

Solar Panels in Roof Mounted, Sigenergy Hybrid Inverter, Batteries & EV charger

  • 16 Jinko Solar panels in roof mounted
  • A 6kW Sigenergy Hybrid Inverter
  • 18kWh of batteries
  • Sigenergy Gateway giving Full house backup
  • Sigenergy 7kW EV charger

We have been working on this project since the summer, our customer Chris & Lisa were completing a full house refurbishment and wanted a suitable system to support their energy efficient house.

On this project we managed to fit 16 solar panels in roof, which in this East-West orientation will generate around 4500kWh per year, the project already had scaffolding, and a new roof was being fitted so it was the perfect time to fit these in roof panels.

You can see the in-roof system just needs a few extra battens putting in and then sits inside the tiles or slates surrounded by a flashing kit.

Solar panels in roof mounted

Solar panels in roof mounted

Here's Chris the owner getting involved with panel fitting. He wears short in the winter as well just in case you were wondering.

The finished product:

Solar panels in roof mounted

As mentioned above, the system is coupled to a Sigenergy Gateway which allows to control of dedicated loads so that solar PV energy can be diverted to these when surplus energy is generated, it also keeps the house operational in the event of a grid power cut.

The Sigenergy system comes as standard with a 10-year manufacturer warranty, AI Built in to ensure the most efficient consumption of electricity.

For more info or to discuss your project give us a call on 0118 449 28 24 or drop us a mail at hello@wokinghamsolar.co.uk